Pages

Weather

Tuesday, 20 December 2011

Pollution board slaps closure notice on Rourkela Steel Plant units

free counters

A report in Times of India

BHUBANESWAR: The Odisha state pollution control board (SPCB) slapped closure notices on the captive power and sinter units of the Rourkela Steel Plant (RSP) on Monday, signaling crisis in the Central PSU.

Though RSP sources maintained they had not yet received official communication in this regard, the SPCB here said the "Sundergarh district collector, as per law, will implement the decision with immediate effect". "We kept the plant under watch for two years. We did not give RSP consent to operate, but had not decided to serve closure notice during this period keeping in mind that it is a major PSU and a source of livelihood to thousands of people. But as the situation did not improve we had no choice but to issue the closure notice," SPCB member secretary Sidhanta Das told TOI. He said in the past two years the SPCB had conducted physical inspection of the plant and talked to officials, hoping the RSP to reduce the pollution level, but in vain.

The plants to be closed in the RSP complex are a 1959-made 50 mw captive power unit and a sinter plant. A RSP spokesperson when contacted said the decision would not affect the production "much". "We are going to make fresh appeal before the SPCB for reconsideration of its directive," the spokesperson said.

Informed sources said closure of one of the three medium pressure boilers in the CPP-1 and the sinter plant-1 may have a chain reaction on other units, leading to fall in steel production. "Steam produced in the old CPP is presently used almost like oxygen for the four blast furnaces. From this the impact of CPP closure can be imagined," said an RSP official. He said sinter plant closure could further affect the plant, as it "converts iron ores into the desired size, fit for feeding the blast furnaces".

The RSP, built in 1983, produces around 7,000 tons of hot metal (liquid iron) daily, 6,300 tons of crude steel and about 5,800 tons of finished steel. The plant has another CPP of 120 mw capacity. It has also a second sinter plant, which for the time being would be used for feeding the four blast furnaces, the sources pointed out.

The RSP is currently undergoing another phase of modernization at an estimated cost of nearly Rs 11,000 crore. "Most of the works like the 5th blast furnace, sinter plant-3, ore bedding and blending unit and a new coke oven unit would be ready by 2012," the plant spokesman said.

Elaborate security for Howrah-Mumbai track

free counters

Times of India reports

JAMSHEDPUR: With the Railway Board announcing resumption of night train service from Monday, the Chakradharpur rail division has made an elaborate security arrangement to preempt any sabotage threat, if any, on the Chakradharpur-Rourkela section of busy Howrah-Mumbai line.

In the wake of passenger trains running for the first time at night on the said section after about 19 months, the railway authorities have taken all security issues into account in run up to the actual start of the service. "In addition to RPF personnel, we have paramilitary personnel on duty to man the track security (in vulnerable zone) on the Chakradharpur-Rourkela section," said RPF commandant A K Chaurasiya, Chakradharpur division.

Three CRPF companies have been deployed at six specific railway stations Jaraikela, Goelkera, Sonuwa, Lotapahar, Posaita and Bhalulata in Maoist-hit West Singhbhum district. "Responsibility of track security has been entrusted with the state government agencies and CRPF personnel will jointly work with the GRP and local police for area domination (track security)," said the commandant.

In addition to this, four companies of special RPF commandoes will travel escorting the passengers on trains crossing the said section. While, a pilot engine with CRPF personnel on board will escort the passenger train from Chakradharpur to Rourkela. Initially, Tatanagar-Bilaspur passenger train and lone express train Howrah-Kurla Shalimar Express will run at night on the announced section.

Tatanagar railway station superintendent R Choudhary said, "Bilaspur passenger and Shalimar Express will run at 75KMPH till Rourkela at night. We hope, gradually other trains will also run at night but we need to wait for the train service resumption on Kharagpur-Tatanagar section."

Authorities at the divisional office said RPF officials are in talks with the Bengal government to seek track security, as the railway force has given its nod for resumption of train service on Kharagpur-Tatanagar section. "The railway has no issue with the security. It is up to the Bengal government to respond since it has to man track security and hopefully, things will be soon resolved," said an RPF official.

Saturday, 17 December 2011

Amway launches new office in Rourkela

free counters

Daily Pioneer reports

Amway India Enterprises unveiled its first office on Friday. The state-of-the-art office would capture the untapped business potential of this industrial belt as well as of western Odisha. With this, Amway’s total number of offices in the State has gone up to five, the other four being in Bhubaneshwar, Baleswar, Jeypore and Brahmapur.

Spread over a 550-sqft area, the new two-storied Amway Touch Point office would house a computerised customer service and product ordering facility and distributor waiting area. It is also equipped with training and counselling room. Distributors residing in Rourkela, Jharsuguda, and surrounding areas would now be able to find information and training on the existing and new quality products from the stable of Amway and order for products across the counter.

Speaking at a Press conference post the inauguration of the office, Amway Vice-President (East) Diptarag Bhattacharjee said, “Odisha, a State with high growth potential, has been continuously witnessing a steady double-digit growth over the last three years. The first eleven months in 2011 has seen our business grow by 34 per cent over the same period in 2010. We are quite hopeful that our presence in Rourkela would drive huge growth, catapulting Odisha to one of the largest contributors of Amway East.”

In a message, Amway India MD&CEO William S Pinckney said, “The opening up of the office with exclusive product training facility in Rourkela is a clear indication of the impressive growth of Amway’s business in Odisha and our commitment to support and be closer to our business owners and customers.”

Wednesday, 14 December 2011

Rourkela-Choudwar industrial route in offing

free counters

Daily Pioneer reports

The State Government has began the building process for the Rourkela-Choudwar railway and road corridor with the IDCO having already commenced land acquisition formalities. The corridor will facilitate goods transportation from industrial units and mines in the region.

According to IDCO Chairman-cum-Managing Director Priyabrata Patnaik, the route will have 163 km of railway track and 465 km of road. As many as 308 minor bridges and 77 major bridges will be constructed at different points of the project.

Sources said that this project involves development of rail and road in elaborate manner. It also includes water supply along with other infrastructural facilities. The industrial corridor will provide six-lane roadways with two-track railway lines.

This corridor will solve the problems relating to inward and outward transportation of goods and minerals under the common infrastructure facilities. It will pass through the heart of coal mining areas which have a reserve of about 65 billion tonnes.

The project will cover 17 large and mega-industries along with 57 other units.

Tuesday, 13 December 2011

U-Turn: Curbs on night trains on

free counters

New Indian Express reports

BHUBANESWAR/ROURKELA: A day after it announced resumption of train services in the night along Maoist-hit regions of Odisha, Jharkhand and West Bengal, the East Coast Railway (ECoR) on Sunday said restriction on movement of passenger trains will continue.

The South Eastern Railway (SER), which too had made an announcement to this effect, made a U-turn throwing passengers into a tizzy. Resumption of movement of trains during night through Kharagpur-Tata, Kharagpur-Adra and Rourkela-Chakradharpur sections would have meant passenger trains going back to normal schedule. However, that will have to wait. At least till December 14.

A communication (bulletin No. 107) from SER in the morning said trains would run in the night but another communication reached local authorities in Rourkela on Sunday afternoon informing that the decision stood cancelled. A senior official at the Chakradharpur Division told a local television channel that the decision was put on hold due to intelligence inputs received from the West Bengal Government.

Talking to this paper, Chief Public Relations Officer of SER Soumitra Mozumdar contradicted his divisional officials saying no such decision was taken to resume trains. He, however, said there are strong possibilities that night train services would resume very soon.

The ECoR, on its part, said unavoidable circumstances led to the continuation of restriction on train movement in the three sections between 10 pm and 5 am and the restriction will remain in force till December 14.

Sources, however, said it was the West Bengal Government which went on the backfoot over security arrangement for allowing night movement of trains in the Maoist-hit regions which led to the confusion.

“It was only after the Mamata Banerjee Government had made a commitment to this effect that a decision was taken and orders were passed from the Rail Board,” sources said adding since the Maoists are desperate to avenge death of Kishenji, the Bengal Government is no mood to take any chance.

A fresh assessment of the law and order situation in the Maoist-affected regions is expected sometime mid next week. Till December 14, all major trains passing by the route will have to abide by the restrictions.

Sunday, 11 December 2011

Night train services resume on Sunday

free counters

New Indian Express reports

BHUBANESWAR: The East Coast Railways has decided to resume night train services in the Maoist-affected contiguous regions of Orissa, Jharkhand and West Bengal on Sunday. The trains which will route through the Kharagpur-Tata, Kharagpur-Adra and Rourkela-Chakradharpur sections will travel with adequate safety precautions and at a restricted speed of 75 km per hour between 10 pm and 5 am during the bandh called by the Maoists.

As a safety precaution, light engines and goods trains will be run before passenger trains during the nights.

According to the schedule released by the ECoR, the Puri-Haridwar Utkal Express will run on normal route - the Cuttack-Bhadrak-Kharagpur-Tata-Jharsuguda route. So will the Haridwar-Puri Utkal Express which will arrive at Jharsuguda on December 12. The Tata-Jharsuguda-Tata Special train will be withdrawn from Monday.

Similarly, there will be no night regulation on the New Delhi-Puri Purushottam Express leaving New Delhi on December 11 nor will there be any restriction in New Delhi-Puri Nandankanan Express and New Delhi-Puri Duronto Express in East Central Railway zone.

Other trains such as Howrah-Koraput Samaleswari Express on both directions will run on normal timing.

The Puri-Patna Baidyanathdham Express, Puri-Guwahati Express, Puri-Darbhanga Express and Bhubaneswar-New Delhi Orissa Sampark Kranti Express will run on their scheduled timings.

The Chennai-Guwahati Express leaving Chennai on December 12 and Chennai-Dibrugarh Express leaving Chennai on December 15 will run as per the original schedule. The Patna-Ernakulam Express leaving Patna on December 15 will run on originally scheduled timings.

Friday, 9 December 2011

Kolkata-Rourkela DTDS air service launched

free counters

Daily Pioneer reports

First time in India a “Per Seat”, fixed cost, fixed schedule air service was launched between Kolkata and Rourkela by DTDS. The business travellers from across India can now expect to travel in style and comfort in charter planes.




DTDS announced plans to launch the service to the industrial city Rourkela from Kolkata, where passengers can book single seats on fixed rates and fly at fixed charter timings. Travellers from across India can fly to the Industrial city and return on the same day. DTDS charter flight timings connect morning flights reaching Kolkata from Bangalore, Mumbai, Chennai, and New Delhi. So travellers to Rourkela from anywhere in India or abroad can reach destinations in shortest time and catch connecting evening flights.

Wednesday, 7 December 2011

‘Government to reclaim unused land’

free counters

New Indian Express reports

ROUREKLA: The State Government was in the process of reclaiming unused land from various lessees, including the railways, and Central government agencies besides the encroachers, said Revenue Minister Surya Narayan Patro on Monday. Land worth over Rs 10,000 crore would be reclaimed by the government and revenue officials would be made responsible to render services in a time frame, he added.

Addressing a gathering at the 32nd Annual Conference of the State Non-Gazette Revenue Field Officers’ Association with Finance Minister Prafulla Ghadei, Patro said new norms would be introduced to make revenue-related services easier and officials delaying files would face the music.

The Government was working to clear the mess over controversial land transfers, majority of which took place in the 1960s, adding that 429 new revenue circles would be formed. Each of the gram panchayats in scheduled areas would have a RI in addition to the 1,842 existing Revenue Circles, Patro stated.

Ghadei claimed that the State’s revenue grew four fold to Rs 16,000 crore, yet around Rs 22,000 crore was spent towards payment of salaries, pensions and interests on debts. The State’s revenue would be augmented to Rs 20,000 crore and this, Ghadei said, could be done as economic health of the rural pockets has improved. He went on to claim that per capita income in the State was on the rise.

Over 1,100 RIs from across the State participated in the conference which pressed for removal of discrepancies in pay structure of revenue officials and introduction of special allowances to members deployed in Maoist-hit areas.

Tuesday, 6 December 2011

CM worried over fatal mishaps at R'kela plant

free counters

Daily Pioneer reports

Concerned over the frequent accidents leading to deaths of workers in the Rourkela Steel Plant (RSP), Chief Minister Naveen Patnaik on Sunday urged the Union Steel Minister to direct the concerned authorities to stop recurrence of incidents.

Patnaik, in a letter to Steel Minister Beni Prasad Verma, ueged him to direcct the RSP authorities to ensure adherence to safety standards in all work procedures and prevent accidents in future.

Describing the regular accidents as unfortunate, he also told him that the RSP authorities must also be asked to take care of the injured and the next of the kin of those killed in the accidents.

Two accidents occurred within two days at the RSP during the construction work for the modernisation of the plant leading to the deaths of two workers. While on Friday one worker lost his life, on Sunday a contractual labourer was killed and another seriously injured.

Drawing the attention of the Union Steel Minister to the two incidents, Patnaik said that since the Steel Authority of India (SAIL) is the largest steelmaker in the country and is a Maharatna company, it is expected that the authorities would be adhering world-class safety standards.

"Unless this is done, we may see recurrence of such tragic incidents which is just not acceptable in this age," he added.

Friday, 2 December 2011

Rourkela to be Municipal Corporation

free counters

The process of upgrading Rourkela Municipality to a Corporation has gained momentum in the recent times. A proposal regarding this was unanimously passed in a monthly meeting held at the Municipality Office on Wednesday.

The meet which was held in the Assembly Hall of Rourkela Municipality and was presided by Chairperson Smt. Rashmibala Mishra had discussions on several issues like upgrading Rourkela Municipality into a Corporation by including several regions of South Rourkela, repairing of PHED water pipes, water supply to each and every ward, improving sanitation facilities etc. Noted lawyer and Councilor Shri Ramesh Bal forwarded the proposal of Municipal Corporation stating that Rourkela Municipality has around 2.73 lakhs of population and by including South Rourkela it will rise up to 3.25 lakhs, which satisfies the criterea. Since South Rourkela doesn't comes under the administration of either Municipality or Gram Panchayat, it is devoid of any basic amenities, which creates a lot of problem for the people residing there.
Replying to the proposal EO Shri Bijay Swain informed that the State has been informed of the proposal , through the District Collector, to which Shri Bal demanded that Rourkela MLA and Urban Development Minister Shri Sarada Nayak should take appropriate steps so that the people of Rourkela can get Municipal Corporation as a New Year Gift. After prolonged discussion, this proposal was passed with everbody's consent.

Tuesday, 29 November 2011

DTDS to Launch Per-Seat Air Charter Services to Jamshedpur, Rourkela & Patna from Kolkata

free counters

DTDS Air Charter services to bring India's Steel cities on the air map, through comfortable "Same - Day - Return" services that save time & boost productivity.

A report from INDIAPRWIRE

Bengaluru, Karnataka, November 26, 2011 /India PRwire/ -- DTDS announced plans to launch "Per Seat" Air Charter Services to industrial cities from Kolkata where passengers can book single seats on fixed rates and fly at fixed charter timings. This is the first time in India that a "Per Seat", fixed cost, fixed schedule, chartered air service connectivity is offered for Industrial cities like Jamshedpur and Rourkela.

Business travelers from across India can now expect to travel in the style and comfort of modern Charter planes to Jamshedpur & Rourkela, attend work and return back the same day. Designed to save businesses time & money, improve connectivity through comfortable "Same - Day - Return" services, DTDS operations in the first phase will bring India's Steel cities not having scheduled commercial flights, on the air map.

DTDS "Per Seat" Charter Services offer convenience and productivity to business travelers to Patna, Rourkela and Jamshedpur from anywhere in India or abroad. "Travelers from across India can fly to these Industrial cities and return same day for dinner with family" says Leslie Marcar, Head - Air Charter Services.

"DTDS charter flight timings connect morning flights reaching Kolkata from Bangalore, Mumbai, Chennai, New Delhi so travelers to Jamshedpur and Rourkela from anywhere in India or abroad, can reach destinations in shortest time and catch connecting evening flights back home. DTDS 'Per Seat' charter service opens up new connectivity options for not only Suppliers, Ancillaries, MNCs, SME & Corporate Businesses but even doctors, patients, students and domestic or international tourists from these cities who will benefit greatly from our affordable air connectivity ex Kolkata or ex Patna, to Metro cities across India" adds Marcar.

Notes to Editor

About DTDS Travel & Tour Planner Pvt. Ltd.

DTDS Travel & Tour Planner Pvt. Ltd., is a pioneer in 'Per Seat' Air Charter Services in India and services clients from its offices in Kolkata, Bangalore, Rourkela, Jamshedpur. DTDS service are available from the convenience of online bookings from its website www.dtdsindia.com and allow travelers to easily select their flights and book & pay for their seat tickets online pay using a credit or debit cards.

For more information, visit D
TDS website : www.dtdsindia.com

Tuesday, 22 November 2011

Chennai Sports Organisers to own Chennai team in WSH

free counters

Telegraph reports

NEW DELHI: Chennai Sports Organisers Pvt Ltd (CSO) has been named the franchise owner of the Chennai team in the multi-million dollar World Series Hockey league to be played across various cities of the country starting next month.

The Chennai-based outfit will be called 'Chennai Cheetahs'.

"It is a matter of great pride to own a franchise in the prestigious World Series Hockey. Chennai has always had a strong sports culture and we are committed to strengthen the talent pool of hockey players," CSO Director L T Nanwani said.

"India has a strong hockey legacy and we will strive towards bringing the glory back. This is the first step for CSO and in the near future, we will expand our sports business by investing in multiple sports to create greater local connect with the fans," he added.

Nanwani is also the director and promoter of Jubilee Granites, a leading mining company in South India that exclusively owns products like 'Black' and 'Black Galaxy' granite.

Announcing the first franchise owner of the league, Yannick Colaco, chief operating officer of Nimbus Sport, one of the promoters of the event along with Indian Hockey Federation, said, "WSH has been very selective in identifying franchise owners who are passionate about hockey and share the common vision of creating a strong and viable ecosystem for the sport in India."

The WSH, to be held from December 17 to January 22, will involve 200 leading players from India and abroad who will showcase their talent in 61 matches.

It will be a multi-city franchise-based league with players being allocated to the teams based on the internationally accepted 'draft' system.

The inaugural edition of WSH will comprise eight teams out of Mumbai, Delhi, Chennai, Hyderabad, Bangalore, Pune, Chandigarh, Bhopal, Punjab, Ranchi and Rourkela.

Biju Patnaik tech varsity VC gheraoed

free counters

A report from Times of India

ROURKELA: A delegation of Biju Pattnaik University of Technology (BPUT) action committee gheraoed BPUT vice-chancellor J N Satapathy here on Monday, minutes before the start of the varsity's third foundation day programme.

The delegation was strongly protesting lack of progress in construction of BPUT headquarter in Rourkela, and handed over a copy of a memorandum in this connection to the vice-chancellor.

The delegation, which included its convener M D Parija, former Rourkela MLA and senior Congress leader Pravat Mohapatra, former Rourkela municipality chairman Ramesh Bal and BJP Rourkela unit president Dhiren Senapati, did not allow the vice-chancellor to enter the function hall as they sat on the floor in front of the entrance gate.

The sit-in continued for about an hour and the VC was finally allowed to go after giving a written assurance that he will meet the members of the BPUT action committee and reply to the points raised in their memorandum.

The memorandum informed that about 139 acres of encroachment-free land was handed over to BPUT at Chhend, Rourkela, for construction of its headquarters.

"The foundation stone of the headquarter was laid on May 15, 2002 by the then President of India APJ Abdul Kalam in the presence of chief minister Naveen Pattnaik, which had given hope to the residents of Rourkela that the prestigious university headquarter, once set up here, will enhance the status of the city," the memorandum said.

"But with construction of the headquarter still to be completed, it has become a matter of great regret that the university is yet to take off," the memorandum added.

"We understand that there has been no fund crisis for construction of the building since the BPUT has already accumulated a good amount of funds, collected from each student during admission," the memorandum pointed out further.

The BPUT vice-chancellor, however, blamed the stalemate on some payment anomalies.

"The construction work of BPUT headquarter was stopped due to a problem in the payment of the architect after an objection of the finance officer of the university, since the architect had stopped providing the necessary drawings for the construction," said Satapathy.


Travel plans off track for 55hrs Route rejig for bridge repair

free counters

A report from The Telegraph

Bound for Mumbai? Halt in your tracks.

Train services on the Howrah-Mumbai route will remain affected for the next two days owing to urgent replacement of girders of a bridge between Posaita and Goelkera stations under Chakradharpur division of South Eastern Railway.




This unprecedented hurdle, which began on Sunday evening and is expected to last 55 hours, is compelling a dozen-odd long-distance trains, including the Howrah-Ahmedabad Express, the Tata-Alleppy Express, the Jnaneswari Express, the Howrah-Hapa Express and the Sambleshwari Express, to run on a diverted route. Most of these superfast trains are plying via Chandil, Muri, Hatia and Rourkela.

“Several trains have been diverted, while a few passenger trains will be cancelled for the next two days. Some others running in the Chakradharpur division will also have to be short-terminated,” said Rajendra Prasad, the station manager-in-charge at Tatanagar.

According to Prasad, the Howrah-Titlagarh Ispat Express will be short-terminated at Chakradharpur station on November 21 and 22. On its return journey, the train will leave from Chakradharpur instead of Titlagarh.

On the other hand, the Chakradharpur-Rourkela and Tata-Bilaspur Passenger will remain cancelled on Monday and Tuesday. The few trains that will continue on their usual route include Mumbai Mail, Geetanjali Express, Howrah-Pune Azad Hind Express, Tata-Patna South Bihar Express and Howrah-Mumbai Duronto Express.

The railway authorities said that the “mega block” was happening for the first time in Chakradharpur division and they had taken necessary measures to ensure that passengers were not greatly inconvenienced.

“An additional ticket counter has been opened at Tatanagar. In case trains are delayed by over three hours, passengers can opt for ticket refund. Due to the mega block, most trains will run behind scheduled for the next three days,” a senior official of Chakradharpur railway division said.

Railway officials at the enquiry office said they were having a tough time answering queries of harrowed passengers though the altered routes and names and numbers of short-terminated and cancelled trains were being announced at regular intervals.

“Enquiries for different destinations are pouring in since morning. Another official had to be deputed at the counter to take care of things,” said one of them.

He added that the railway authorities had issued a circular, stating that services on the route would remain affected till 3pm on Tuesday.

Passengers said they had either dropped or shelved their travel plans.

“I was supposed to travel to Titlagarh tomorrow. When I came to buy my ticket at Tatanagar, I was alerted that my train would be short-terminated at Chakradharpur. I was going to Titlagarh for the first time and thought it better not to take chances. I will travel once the train services become normal,” said Amitabh Senapati, a Jamshedpur student activist.

M.V. Rao, a schoolteacher, also dropped his plan to visit Rourkela by train since the Tata-Alleppy Express was diverted. “The train will travel via Chandil and will not touch Rourkela,” he said.

Meanwhile, the Bhubaneswar-bound Rajdhani Express was delayed by over 12 hours on Sunday. The train is expected at Tatanagar at 10.30pm instead of 10.30am. Foggy weather has been stated to be the reason behind the delay.

Raghunath Mohanty asks Industrial houses to help government raise growth rate

free counters

Economic Times reports

ROURKELA: Odisha government has claimed to have taken special measures with focus on value addition of mineral resources in order to boost economic growth and said industries must play a key role in this direction.

This was stated by state Industries and Steel and Mines minister Raghunath Mohanty at a function marking the golden jubilee celebrations of Rourkela Chamber of Commerce and Industries (RCCI) here last night.

The minister said all industrial houses and general public should extend their cooperation to the government to raise overall growth of the state to double digit by 2012-13.

Efforts are underway to make it mandatory for private mining lease holders to provide 70 per cent of the iron ore to state based industries for domestic consumption and Odisha Mining Corporation would ensure supply of 80 per cent of its production to industries in Sundargarh District, he said.

All possible support would be extended to Sundargarh presently facing industrial slowdown and necessary measures would also be taken to tide over the problems due to high cost of iron ore, the minister said adding he would take up the issue of increase power tariff with higher officials.

The scarcity of coal supply would be sorted out and the government was contemplating suitable amendment through a deal for effective regulation of ground water he said.

The government envisages economic progress through industrial expansion and agriculture development and plans are afoot for industrial parks, auto complex, and food processing parks in the state.

The big industrial houses should create conditions for setting up of downstream industries as state government has been laying adequate thrust on small and medium industries in the state, the minister said.

However, he admitted that land acquisition, pollution control, smooth implementation, R and R policy and quality technical institutions continue to be major challenges.

Earlier, RCCI members highlighted hindrances to industrial growth of the district including bad roads, inadequate rail infrastructure, absence of air connectivity, rising cost of raw materials and power.

State may lose out on IIM on 12th Plan period

free counters

Daily Pioneer reports

Chances of Odisha having an Indian Institute of Management (IIM) in the Twelfth Plan period look bleak.

Sources in the Union Ministry of Human Resource Development say the Ministry will be recommending four new IITs but no new IIMs in the Twelfth Plan period. With four new IITs, as many major States will have an IIT each.

However, the proposed plan to have no new IIMs means Odisha and a few other States will lose out on the IIMs. In 2008, when eight new IITs and seven new IIMs were announced, it was proposed that each of those States would have a new IIT or a new IIM, not both. A State which got an IIM last time and does not already have an IIT will now get an IIT.

But since the 12th plan will not have any new IIMs, Odisha will miss an IIM. It is high time the Odisha Government pursued with the Planning Commission and the Prime Minister against such injustice to the State, pointed out leading NRO (non-resident Odia) Chitta Baral, who teaches at the Arizona State University in the US.

Given the large-scale investment in the industrial sector, the requirement of management graduates in Odisha has gone up manifold. While the XIMB has opened the facility here in the mid-80s, several management outfits have come up during the intervening period.

However, the State needs an IIM, and Chief Minister Naveen Patnaik, in a letter to Prime Minister Manmohan Singh, justified the demand by highlighting the massive investments lined up in the State’s industrial and other sectors.

Patnaik said an IIM is imperative to develop requisite human resources in the State. The Chief Minister had also impressed upon Union HRD Minister Kapil Sibal to set up a Central Government management institute in the State. He has all along assured that the State Government would provide the requisite land and other infrastructure for the purpose.

Now, it seems once again the State Government would have to press hard with the Union Government and the Planning Commission to earmark an IIM for Odisha, said Baral.

Saturday, 19 November 2011

Improving Railway connectivity from Rourkela to South India

free counters

South India has always attracted people from all over the country in terms of job and education. Major IT hubs and a number of good educational institutes are present all over the region, the major being Bangalore, Chennai and Hyderabad. A number of people from Rourkela as well as rest of Odisha work in these places. So the connectivity to these places needs to be improved, the measures are as follows

IMPROVING CONNECTIVITY TO CHENNAI

Currently Rourkela-Chennai by Dhanbad/Tata-Alleppey is 1449 kms and it takes 32 hours.The journey is tiresome and hectic, the train is nothing more than a crawler till it crosses Andhra Pradesh into Tamil Nadu. This train stops at almost every station on its way just like a passenger train and is the first preference of locals in Andhra. It is always overcrowded and even AC coaches are not spared, what to talk of Sleeper and General Class. This train departs before Hatia/Tata-Yesvantpur from Vizianagram but reaches after Hatia-Yesvantpur at Visakhapatnam (Tata-Yesvantpur bypasses Visakhapatnam).



The distance between Bhubaneswar and Chennai is 1226 kms. which is covered in 21 hours 25 mins by Howrah-Chennai Mail, and in 20 hours 55 mins by Bhubaneswar-Chennai Express. If a superfast Express between Rourkela and Chennai is proposed then it can take the timing of Bhubaneswar-Chennai Express from Visakhapatnam. The total time in this journey will be around 25 hours 55 mins.

IMPROVING CONNECTIVITY TO BANGALORE



The route Rourkela-Yesvantpur is 1737 kms and is covered by 31 hours 55 mins by Hatia/Tata-Yesvantpur Express.(It includes 255 kms. of non-stop running between Vijayawada and Nellore by Hatia-Yesvantpur Express). The distance between Nellore and Gudur is 39 kms. however the slot assigned between these stations is 1 hour 19 mins., which should be reduced.



And another interesting fact is that most of the time these trains reach their stations much before their scheduled time,say 30 mins, and have to wait until their original departure time. This happened once at Gudur, when the train reached there at 7:50 pm and had to wait till 8:15 pm, the stop being only of 2 mins.During a journey 1.5 hours was lost in waiting at stations, howver the train was able to reach at its destination at time. This train can complete the journey in 28 hours 40 mins. or utmost 30 hours.The frequency of these trains need to be increased so that the whole of Western Odisha gets daily availablity to Bangalore.

I FEEL THAT THERE IS NO RESERVATION QUOTA,FOR PASSENGERS FROM ODISHA IN BANGALORE BOUND TRAINS. First the seats from Ranchi and Jamshedpur are filled up then the remaining seats are given to Odisha passengers. Most of the time people have to travel by getting Tatkal accomodation. thus paying more than their Jharkhand counterparts and adding more revenue to the Railways. Hence sufficient number of seats should be made available to the passengers of Odisha.

Further the coaches provided in Hatia-Yesvantpur Express are old, shabby and in a tottering condition. New rakes should be provided for this train.


Most of the trains going to Bangalore from Bhubaneswar take the route via Chennai which is about 1588 kms. and is covered in 28 hours 10 mins. while the same is covered by Prashanti Express in 30 hours 25 mins via Guntur,Guntakal,Dharamavaram ,Sri Satya Sai Prashanti Nilayam ,which is about 1638 kms

The superfast Bhubaneswar-Yesvantpur (via Renigunta,Tirupati,Chittoor,Katpadi) takes just 27 hours 30 mins to reach its destination covering a distance of 1518 kms.

If a superfast between Rourkela and Bangalore City via Chennai is proposed then it will take 1449 kms.+362 kms. = 1811 kms. and the total journey time will be around 29 hours.( 23 hours to Chennai and 6 hours to Bangalore)

Korba-Yesvantpur Wainganga Express via Bilaspur,Raipur and Kacheguda (Hyderabad) takes 30 hours 50 mins to cover a distance of 1602 kms. It takes 27 hours 45 mins to cover 1513 kms. between Bilaspur and Yesvantpur. If a superfast between Rourkela and Bangalore City is proposed then it will cover 1519+306= 1825 kms. in 33 hours 30 minutes.

So compiling all the above given facts, the conclusions are

 Increase the frequency of Hatia-Yesvantpur Express to 4 days a week and Tata-Yesvantpur Express to 3 days a week

 Introduce a Weekly Rourkela-Yesvantpur Superfast Express on the same timing of Hatia/Tata-Yesvantpur Express

 Introduce a Weekly Rourkela-Bangalore City Superfast Express on the same timing slot of Korba-Yesvantpur Wainganga Express. This will connect Hyderabad and Bangalore with Rourkela

 Introduce Biweekly Rourkela-Chennai Superfast Express on the timings of Bhubaneswar-Chennai Express from Visakhapatnam. This can also run up to Bangalore via Chennai

 Enroute Guwahati-Chennai Express or any train from North East or Bihar to Chennai to go via Rourkela,Jharsuguda,Sambalpur, Titlagarh,Rayagada, Vizianagram, Visakhaptnam/Duvada, twice a week. It should be noted that two Guwahati-Chennai Express travel via Tatanagar ,twice a week

By implementing any two of the above mentioned measures we can improve the connectivity of Rourkela with South India to a large extent.

Choudwar-Rourkela Industrial Corridor begins

free counters

IBNlive reports

BHUBANESWAR: The state government has started work on development of a railway corridor through Choudwar to Rourkela to allow ease of inward and outward transportation of goods from the industrial hubs and mining belts along the region.

Land acquisition for the project, the first of its kind initiative by a state government, has already been initiated by the Industrial Infrastructure Development Corporation (Idco). The project would go on ground after the land acquisition and is targeted to be completed by 2015, said Idco CMD Priyabrata Patnaik on Friday.

The corridor involves development of extensive rail and road connectivity, along with provisioning of water supply and other infrastructural facilities. The corridor would encompass two track railway lines and six-lane road passing through the industrial hubs and the coal mining belts. New industrial areas and downstream units would be developed along the corridor.

Common infrastructure facilities under the corridor would solve the problems of inward and outward transportation of goods and minerals. The stretch would pass through the heart of coal mining operations in the state, which harbours about 65 billion tonne of reserves. The coal reserves in the Talcher belt only is around 43 billion tonne.

The corridor would cover 17 large and mega-industries, along with 57 other units, through the stretch from Choudwar to Rourkela. Traffic projection on the route is given out as 8.7 million tonne.

The route would have 163 km of railway track length and 465 km on road. As many as 308 minor bridges and 77 major bridges would have to be constructed on it, said Patnaik.

Thursday, 17 November 2011

Jareikela station lies in neglect

free counters

News from IBNlive

ROURKELA: Declared abandoned in 2006, the dilapidated railway station building at Jareikela in Sundargarh district, bordering Jharkhand, poses serious threat to the lives of employees and passengers.

�Ironically, there is no obvious reason for the inordinate delay in setting up the proposed new building by the Chakradharpur Division of the South Eastern Railway (SER).

�The nondescript Jareikela station, about 30 km from Rourkela, falls in the Maoist-hit Bisra block. The existing station building is one of the oldest with asbestos roof. It houses the office, ticket counter, rest room and track signal system. The walls have developed wide cracks and the artificial ceiling is dilapidated.

Nearly a dozen SER staff in different shifts fear for their lives while on duty.

When rain lashed the area for days together last month, they feared that the structure would cave in. An old giant tree at the backyard is also leaning dangerously on the weak structure.

�Local weaver of Kopsingha village in Jareikela gram panchayat, Somnath Raha said the SER seems to have no concern for innocent lives. Expressing surprise at the whimsical attitude of the SER, he said while the platform floor is being laid with new tiles, there is no sign of a new building.

�Chakradharpur-based SER spokesperson AK Haldar promised that the Division would probe the matter for immediate corrective measures.

�SER sources said the record of the present ongoing construction project does not reflect the new station building plan.

BSLC halts limestone, dolomite production on green concerns

free counters

A report in Economic Times

ROURKELA: State-run Bisra Stone Lime Company (BSLC) has stopped production of limestone and dolomite following a directive from the Orissa State Pollution Control Board (OSPCB).

Company sources said mining operations had to be stopped last week following the direction of the OSPCB, Bhubaneswar, after environment clearance for the mining sites expired on March 31, 2011.

OSPCB had issued a letter on November 9 mentioning that consent to operate cannot be considered because the company has not submitted the environment clearance in respect of their mines, they said.

However, BSLC claimed it has got all the valid mining papers and requested the OSPCB to issue consent to operate on the basis of the valid environment clearance for 18,000 tonnes of production per month.

Due to the halt in production, the century-old BSLC has been facing difficulties in supplying material to customers like Steel Authority of India Limited and Neelachal Ispat Nigam Limited, sources said.

The company, meanwhile, has applied to the State Pollution Control Board for renewal of environment clearance for the mines after meeting all criteria, they said.

BSLC Mining Operations Chief Anup Bage said there was no forest land in its mining area and the company has been planting trees in its area regularly to keep the surroundings pollution free, with a green cover.

The company has also been making payment of royalty and abiding by all statutory rules of the state government.

Meanwhile, Independent MLA from Biramitrapur George Tirkey has demanded immediate steps for resumption of production by BSLC at Biramitrapur, in Sundargarh district, as about 25,000 persons -- including more than 1,000 regular employees -- depend on the company for a living.

Moreover, the company is situated in a tribal area and more than 80 per cent of its employees are tribals.

150 Indian players sign up for WSH

free counters

Report from IBNlive

Mumbai: Notwithstanding the Hockey India diktat asking players to either stay away from the World Series Hockey (WSH) or risk losing their place in the national side, the current Indian team members have signed on and received advanced payments to play in the league beginning next month.

A total of 150 Indian players, including all the top stars from the present national side, have virtually signed a three-year-contract with the organisers of the league to be played across different cities of the country from December 17 to January 22.

WSH is a lucrative franchise-based event organised by the Indian Hockey Federation (IHF) and Nimbus Sports. IHF is not affiliated to the FIH and the world body recognises Hockey India (HI) as the national federation.
The tournament has been in the centre of the 'club vs country' controversy.

The tournament has been in the centre of the 'club vs country' controversy as it is not a FIH-sanctioned event.

FIH has also threatened to bar the players from its future tournaments if they take part in WSH. The world body has suggested the players to wait till 2013 when FIH and Hockey India launch their own world league.

A media release from the organisers on Thursday claimed that veteran forwards Arjun Halappa and Prabhjot Singh, goalkeeper Adrian D'Souza and mid-fielder Sardar Singh have been signed up by the organisers to play in the tournament that would feature eight franchise teams for 61 matches.

These players will be captains in the inaugural edition of the tournament.

The other Indian players include ace drag-flicker Sandeep Singh, current captain Rajpal Singh, goalkeeper Bharat Chetri and emerging champion Yuvraj Walmiki, who dazzled with his tournament-winning goal at the Asian Champions Challenge.

WSH also marks the comeback of former players Viren Rasquinha and Dhanraj Pillay.

The league will also see the participation of Gurjinder Singh, the India U-21 captain, 19-year-old forward Kangujam Chinglensana Singh, forward Victo Singh and the best player of the last National Games, S K Uthappa.

Prominent international players who are on the roster include Baljeet Singh, Deepak Thakur, Dhananjay Mahadik, Diwakar Ram, Gurbaj Singh, Mandeep Antil, Prabodh Tirkey, Roshan Minz, Shivendra Singh, S V Sunil, Tushar Khandker, and William Xalxo.

"I am really excited about playing in the inaugural edition of World Series Hockey. It's a great initiative for the sport of hockey and I can't wait to play alongside the best hockey players from India and around the world," said Prabhjot Singh.

Karl Da Costa, Deputy General Manager, Nimbus Sport, said, "We are proud to announce the participation of all the star Indian players in World Series Hockey. One of the key focus areas for the league is to fortify the talent pool of hockey in India and it will be a splendid display of skill as our Indian champions will play with global superstars."

The WSH will involve 200 leading players - Indian and international - who will showcase their talent in 61 matches.

It will be a multi-city franchise-based league with players being allocated to the teams based on the internationally accepted and practised 'draft' system.

The inaugural edition of the league, with a total prize money of approximately USD two million, will comprise eight teams out of Mumbai, Delhi, Chennai, Hyderabad, Bangalore, Chandigarh, Pune, Bhopal, Punjab, Ranchi and Rourkela.

Night trains may get green signal in Red Zone

free counters

Report from IBNlive

ROURKELA: Night trains chugging through the busy Howrah-Mumbai route of the South Eastern Railways (SER) may soon become a reality here if the news percolating from top railway and security officials is any indication. There has been a restriction on night trains along Rourkela-Kharagpur section following Maoist attacks. However, there has been no official word from the SER on the decision.
Sources said the Railway Ministry, under tremendous public pressure, has decided to re-run trains at night. The move was backed by several rounds of meetings by security forces of Orissa, Jharkhand and West Bengal in the last fortnight. They reportedly have given safety clearance prompting the Railway Ministry to give a green signal.
Train services between 10 pm and 5 am on the Rourkela-Kharagpur and Kharagpur-Adra sections of the SER have been suspended since May 28 last year after Maoists allegedly blew up tracks in Bengal to derail the Jnaneswari Express leading to heavy casualties.
While restriction on the Kharagpur-Adra section was removed recently, any decision on the Rourkela-Kharagpur section lingered till recently.
The Kolkata-based CDPO Soumitra Majumdar said any written communication to this effect is awaited from the Railway Board. Similarly, Sundargarh Collector Rupa Roshan Sahu said her office is yet to receive any communication.
Jharkhand’s Chaibasa-based DIG Naveen Singh said in larger public interest trains should run at night, adding they have time and again assured the railways of necessary security. Rourkela SP Himanshu Lal asserted that adequate security will be ensured.
Officials requesting anonymity said night train services are likely to be restored in a few days.
The decision follows the recent visit of the Parliament Railway Convention Committee to Rourkela.

Repair works on Howrah-Mumbai mainline, Trains to be affected

free counters

Rail movement on Howrah-Mumbai mainline is likely to be affected on 21st and 22nd of this month, due to repairing of Bridge no.206(DN) on Goilkera-Posoita section of Chakradharpur Division of South Eastern Railway. According to sources, Train no. 58115/58116 Chakradharpur-Rourkela-Chakradharpur Saranda Passenger has been cancelled for two days while Howrah-Titlagarh Ispat Express and Bilaspur-Tatanagar Special have been short terminated.Services of Ispat Express has been suspended between Chakradharpur and Rourkela, and this train will ply between Howrah and Chakradharpur as 12871 and return from Chakradharpur to Howrah as 12872.The same will also apply between Rourkela and Titlagarh. 08114 Bilaspur-Tatanagar Passenger will originate from Rourkela and will ply to Bilaspur.

Some trains plying between Rourkela and Howrah/Tatanagar have been diverted,especially those running on down line. These trains will be diverted via Hatia-Muri-Koteshila-Purulia-Chandil-Tatanagar on 21st and 22nd November. 18189/18190 Tata-Alleppey Express is on this list while its counterpart 13351/13352 Dhanbad-Alleppey Express has been rescheduled.Similarly 18029 Lokmanya Tilak(T)-Shalimar Express which will depart on 19th from LTT, will be diverted via Hatia-Muri on 21st November. 12833 Ahmedabad-Howrah Express departing on 19th and 20th November will be diverted via Hatia-Muri to reach Tatanagar on 21st and 22nd November. Other trains like 12905 Porbandar-Howrah Express and 18006 Koraput-Howrah Samaleswari Express have also been rescheduled.Railway authorities have been directed to handle the situation arising of this rescheduling and have been instructed to complete the repair works as soon as possible.

Tuesday, 15 November 2011

Why Rourkela Division should be constituted immedietly?

free counters

This post is based on how a Railway Zone known as South Eastern Railways has exploited the mineral rich industrial region of Odisha, and has always pursued a biased attitude towards the development of the state.

Sundargarh, Jharsuguda and Kendujhargarh districts of Odisha , account for the huge revenue generated by Chakradharpur Division and hence also for South Eastern Railway Zone, but unfortunately remain the most neglected regions in comparison to rail connectivity and facilities in the other part of the country.

Chakradharpur Division of South Eastern Railway has emerged as the highest revenue generating division in the country, a number of times. The sole reason for this is notable achievement is the mineral rich Chotanagpur Plateau region popularly known as “Ruhr of India” due to its innumerable industries. This region comprises of the mineral rich Sundargarh,Kendujhargarh and Jharsuguda Districts of Odisha from where Iron Ore and other minerals are transported throughout the country.

The region also has a number of heavy industries like Rourkela Steel Plant, Rourkela; OCL-Rajgangpur; Tata Refractories, Belpahar,Adhunik Metalliks-Rourkela; L&T- Kansbahal, Bhusan Steel and Powers –Jharsuguda; Vedanta-Jharsuguda; GOCL,Rourkela etc. which pay a huge amount to the railways for transportation of raw materials as well as finished products. Hence a lot of freight activity is noticed in this region.

Odisha state has got 2495 kms. of railway route, of which 337 kms. the highest in the state, passes through Sundargarh District. Only Sundargarh district generates about Rs 800 crores annually, which accounts for 40% of the total revenue generated by Chakradharpur Division. Similarly Jharsuguda is an emerging industrial hub with a number of operating mega projects, while a number of industries are in the offing. Kendujhargarh is popular for its innumerous mines.
So its natural that the people will have high expectations from the Railway Budget every year but most of the times they are met with empty hands.
I. The figures mentioned here are a comparison between the major cities in the region,which are administered by South Eastern Railways i.e. Rourkela, Jamshedpur (Tatanagar) and Ranchi.

City Total Number of Express
Trains
Ranchi 35
Rourkela 30
Tatanagar 37


City Total Number of Express
Trains Terminating
Ranchi 28
Rourkela 02
Tatanagar 06

City Total Frequency
Ranchi 134
Rourkela 132
Tatanagar 166

City Weekly Aavailability
At Stations
Ranchi 268
Rourkela 264
Tatanagar 332


II. List of Express Trains that have been introduced/extended from/to Ranchi, Tatanagar and Rourkela in the last 10 years

RANCHI

Hatia-Lokmanya Tilak(T) Express
Ranchi-Patna Janshatabdi Express
Ranchi-Bhagalpur Vananchal Express
Ranchi-Jaynagar Express
Puri-Hatia Tapaswini Express
Hatia-Patna Express
Ranchi-Dhanbad Intercity Express
Hatia-Yesvantpur Express
Ranchi-Varanasi/Ajmer Garib Nawaz Express
Ranchi-New Delhi Jharkhand Sampark Kranti Express
Ranchi-New Delhi Rajdhani Express, via Gomoh
Ranchi-Chopan Express
Ranchi-New Delhi Garib Rath Express
Guwahati-Ranchi Express
Howrah-Ranchi Express via Dhanbad
Hatia-Bhubaneswar Garib Rath Express ( Now Dhanbad-Bhubaneswar Garib Rath Express)
Howrah-Ranchi Express via Kharagpur
Ranchi-Pune Express

ROURKELA

Rourkela-Bhubaneswar Intercity Express
Rourkela-Koraput Express

TATANAGAR

Tata-Yesvantpur Express
Tatanagar-Amritsar Jallianwalabagh Express
Dhanbad-Tatanagar Subarnarekha Express
Asansol-Tatanagar Express



III. Other trains which have been introduced during this period via these stations

RANCHI

Sambalpur-Varanasi Express
Darbhanga-Hyderabad Express

ROURKELA

Howrah-Lokmanya Tilak(T) Samarsata Express
Howrah-Lokmanya Tilak(T) Jnaneswari Express
Hatia-Lokmanya Tialk(T) Express
Howrah-Mumbai Express
Guwahati-Lokmanya Tilak(T) Karmabhoomi Express
Howrah-Shirdi Sai Nagar Express
Hatia-Yesvantpur Express
Dhanbad-Hatia-Bhubaneswar Garib Rath Express
Sambalpur-Varanasi Express
Hyderabad-Darbhanga Express
Santragachi-Hazur Sahib Nanded Express
Santragachi-Porbandar Kavi Guru Express
Ranchi-Pune Express
Shalimar-Udaipur Express

TATANAGAR

Howrah-Lokmanya Tilak(T) Jnaneswari Express
Howrah-Mumbai Express
Guwahati-Lokmanya Tilak(T) Karmabhoomi Express
Howrah-Shirdi Sai Nagar Express
Bhubaneswar-New Delhi Rajdhani Express via Tatanagar
Bhubaneswar-New Delhi Odisha Sampark Kranti Express
Shalimar Gorakhpur Express
Santragachi-Hazur Sahib Nanded Express
Santragachi-Porbandar Kavi Guru Express
Shalimar-Udaipur Express
Howrah-Ranchi Express via Kharagpur
Howrah-Barbil Janshatabdi Express
Howrah-Purulia Express

IV. If connectivity of Rourkela to the National Capital is considered , then Rourkela is far behind its counterparts. Only one train i.e. Kalinga Utkal Express which runs between Puri and Haridwar is the sole connectivity to the national capital from the Steel City. However this train bears the brunt of any insurgent activity or any natural calamity in the region. More than a year has passed, this train has not touched Rourkela, after the disastrous Jnaneswari Express mishap on 28th May 2010.
Here is an interesting comparison of different steel cities of India and their connectivity with Delhi

City/Urban Complex No. of Trains No. of Exclusive Trains
Asansol-Durgapur 12 00
Bokaro Steel City 06 00
Durg-Bhilainagar 05 01
Rourkela 01 00
Tatanagar 06 01
Visakhapatnam 04 04

It should be noted that out of the 6 trains from Tatanagar to Delhi, 5 trains are from Odisha (including Rajdhani and Sampark Kranti)! Instead of catering to the needs of the people of the state, these trains are used to satisfy the neighboring Jharkhand State.


V. If we consider the case of local commuter trains, then perhaps Odisha is the only state which is devoid of such service. It should be noted that a number of local trains operate in the neighboring states of Chhattisgarh,Jharkhand, West Bengal,Andhra Pradesh, Bihar etc. but not in Odisha. (A compensatory service operates between Balasore and Kharagpur only).

South Eastern Railway,gets its maximum revenue from Odisha, utilizes. this huge revenue for the betterment of the neighboring states.. Maximum number of EMU/MEMU /DEMU local trains operate in Kharagpur Division only.

While Chakradharpur Division operates 3 pair MEMU Local trains between Kharagpur and Tata; 1 pair of trains between Muri and Tata and another pair between Asansol and Tata , no such service operates in Odisha, from where this division gets its lion’s share revenue.



Following is the list of some local trains operating in South Eastern Railways

MEMU (Mainline Electric Multiple Unit) Passenger trains

 Howrah-Kharagpur : 116 kms. (2 pairs)

 Tata-Kharagpur :134 kms.(3 pairs)

 Midnapore-Howrah : 129 kms.

 Midnapore-Jhargram : 52 kms.

 Muri-Tata :104 kms.

 Muri-Ranchi : 65 kms

 Tata-Asansol : 119 kms.

 Adra-Purulia :41 kms.

 Adra-Asansol :50 kms.

 Adra-Bankura : 53 kms.

 Adra-Midnapore : 155 kms

 Balasore-Kharagpur : 116 kms

 Ranchi-Asansol : 227 kms..

 Jhargram-Purulia : 246 kms.

 Midnapore-Jhargarm : 52 kms.



DEMU (Diesel Electric Multiple Units) Passenger trains

 Digha-Santragachi

 Baripada-Rupsa-Balasore :70 kms. (2 pairs)

 Rupsa-Baripada

 Rupsa-Balasore

 Kharagpur-Jhargram ;39 kms

 Jhargram-Ghatsila : 59 kms.

It should be noted that Kharagpur-Midnapore MEMU Special train operates for a distance of only 13 kms. ! Also Rourkela-Sambalpur DMU has been officially downgraded to a pair of passenger trains i.e. Rourkela-Jharsuguda and Jharsuguda-Sambalpur. No such commuter train plies in Odisha part of East coast Railway , while many do ply in Andhra part of East Coast Railway.


VI. Construction and survey of new railway lines has not been taken up seriously in the region. The burning example is Talcher-Bimalagarh railway route which could have been a boon to the tribal districts of Sundargarh and Keonjhar is being overlooked since 1885 after the positive cost and benefit analysis.
This route could have proved a boon for the people North - east districts of Odisha as it could have accelerated the development of the region as well as improved connectivity to Coastal Odisha especially between Rourkela City and the capital city of Bhubaneswar. This route would also provide an easy access to Paradeep port from the Chotanagpur Industrial Belt . The cost of this Project was estimated to be Rs.810.78 crores. However with every passing year, this estimate is increasing it is now more than Rs.1000 crores. Now. the funding is much less for this project(about 25 crores.) and the current rate it will take more 20 years to be completed.
Similarly the survey for a new railway line between Bansapani and Barsuan via Bimalagarh and doubling of the track between Dumetra and Champajharan is to be carried on.

VII.No significant steps have been taken by South Eastern Railway, to improve the basic infrastructure in the region. Not even the staff quarters in the railway colonies are in good condition having frequent water and electricity problems. Even no significant education facilities have been provided by South Eastern Railways. Here is a list of such institutions.


Major Hospitals

Garden Reach Medical College and Hospital

Kharagpur Medical College and Hospital

Adra

Chakradharpur

Schools /Colleges/Educational Institutions

SER Mixed Higher Secondary School
S.E. Railway Boys’ Multipurpose High Secondary School
S.E. Railway Mixed High School (New Settlement)
Staff Training

Zonal Training Centre,Sini
Supervisory Training Centre, Kharagpur
S&T Training Centre, Kharagpur
Electrical Training Centre,Tatanagar
Electrical Training Centre, Rourkela
RPF Training Centre,Kharagpur
Major diesel Sheds

Visakhapatnam, Kharagpur and Bondamunda

Major Workshops

Kharagpur









In addition this, several new projects including educational institutions and training centers have been proposed in the last budget for Kharagpur only.
There was a proposal to set up a new 100 electric locomotive capacity shed at Bondamunda, but unfortunately that has been shifted to Kharagpur. Similarly the demand for a Railway Coach factory/ Wagon factory has not yielded any results.
So anyhow , South Eastern Railway has laid its lines in Odisha, not for the development of railway infrastructure of the state, but with the sole motive of exploiting it. As per the figures it can be concluded that the huge revenue generated by Odisha i.e. from the districts of Sundargarh, Jharsuguda and Kendujhargarh is being utilized for the development of Kharagpur,Ranchi and Tatanagar.
Hence without any further delay these districts of Odisha should be freed from the clutches of South Eastern Railway, and should be included in East Coast Railway with a divisional headquarter at Rourkela.

Friday, 11 November 2011

Cuttack to be slum free under Rajiv Awaas Yojana ,Rourkela to follow

free counters

Daily Pioneer reports

REPL, one of the leading real estate consultancies, has been assigned to undertake a slum free planning city project in Cuttack by Cuttack Municipal Corporation under the ambit of a Central Government scheme Rajiv Awaas Yojana (RAY).

REPL has already worked on identification and redevelopment of slums for Bikaner in Rajasthan earlier.

The RAY aims at providing Central support to States that are willing to assign property rights to slum dwellers. A budget of `1,270 crore has been allocated by the Ministry of Housing and Urban Development for the scheme for the year 2010-11. 30 cities across 16 States have been selected for initiating 'National Slum Free City' campaign.

REPL will be setting up a City Technical Cell at Cuttack with a team of six experts- MIS (Management Information Systems) specialist, GIS (Geographical Information System) specialist, town planning specialist, social development specialist, capacity building/training specialist and project/engineering specialist. The City Technical Cell is envisaged to play a critical role in implementation of the RAY.

Bhubaneswar Development Authority (BDA) is the State Level Nodal Agency ( SLNA) for implementation of the RAY in the selected cites of Odisha. It has proposed to set up separate City Technical Cell (CLTC) for the cities at Bhubaneswar, Berhampur and Rourkela.

In this project, REPL will lay its expertise in providing the entire scope of services mentioned under the guidelines of the RAY. This would include preparation of city wide base map using satellite data.

This will aid in accurate identification, demarcation and categorisation of slum area and slum infrastructure along with any vacant lands available for future housing and relocation of the urban poor. This exercise will include the city fringes where the problem of sprawl is more pronounced.

REPL will also provide support to conduct household socio-economic and bio-metric surveys for identification of beneficiaries.

Rourkela bound bus meets with an accident, 3 dead

free counters

Indian Express reports

DHENKANAL: Three persons died and 30 sustained injures, 10 seriously, after a bus collided with a truck near Mahisapat on NH-55 on Tuesday night. Two died on the spot and another succumbed in the district headquarters hospital. The deceased have been identified as Suvendu Samal of Kendrapara district, Chandrakant Mohapatra of Ratnapur in Jajpur district and 11-year-old Amisha Khandei of Jajpur district.

The injured were admitted to district headquarters hospital while four of them were shifted to SCB Medical, Cuttack. Fire Brigade and Red Cross volunteers rescued the passengers.

The bus was heading towards Rourkela while the truck was going towards Cuttack. Urban Development Minister Sarada Prasad Nayak visited the hospital.

Block BJD Chief Dies:

President of the BJD’s organisational block in Rourkela, Babu Samal (41), died in a bus accident on Tuesday night.

A Rourkela-bound bus carrying him met with an accident near Dhenkanal. Samal’s body was brought to the BJD office at Rourkela where tributes were paid to him before being taken for funeral.

Urban Development Minister Sarada Prasad Nayak and other party leaders condoled Samal’s sudden demise.

Thursday, 10 November 2011

Pune train set for Nov. 16 debut, Rourkela to get direct link to Jammu Tawi

free counters

A report from Telegraph

The prolonged wait for Hatia-Pune Express will end on November 16, with Union tourism minister and Congress leader Subodh Kant Sahay flagging off the train for its maiden journey from Hatia junction. Two more trains will get extended destinations on November 12.

“The Union minister has already given his consent to be the chief guest at the flag-off ceremony at Hatia railway station on November 16,” said senior divisional commercial manager of Ranchi railway division K.S. Mukherjee.

The train to Pune, which will run twice a week, will depart from Hatia at 8pm on Mondays and Fridays and reach its destination at 2.30pm on the following day. From Pune, it will proceed for its return journey at 10.45am on Wednesdays and Sundays and reach here at 5.10am the next day.

This apart, the Jammu Tawi-Hatia Express will be extended till Rourkela from November 12. Hitherto, Rourkela could enjoy the services of only Hatia-Puri Tapaswini Express, Hatia-Bhubaneswar Garib Rath Express and Hatia-Jharsuguda Passenger.

Ranchi-Lohardaga train will also start plying till Barkichampi on the newly laid 15km track from November 12. A function has been organised at Lohardaga station where local MLA Kamal Kishore Bhagat and MP Sudarshan Bhagat will jointly flag off the train.

At present, eight passenger trains run between Ranchi and Lohardaga daily, connecting numerous villages of the two districts with the state capital. Before the passenger trains to Lohardaga were introduced, villagers ferrying agricultural produce to Ranchi had to depend on buses, the fare of which was a steep Rs 40.

Now, they can reach Ranchi in one and a half hours at just Rs 12.

Sub-collector caught while taking bribe

free counters

A report in New Indian Express

ROURKELA: Panposh Sub-collector Roopak Kumar Patnaik was on Wednesday caught red-handed by the anti-corruption sleuths while accepting a bribe of `10,000.

Reports said Manas Chandra Baral had applied for lease to lift sand from the Padampur Ghat under Kuanrmunda tehsil. However, his file got stuck at the sub-collectorate.

Sambalpur-based Vigilance SP Manoranjan Panda said Baral sought the help of the Vigilance department after he was asked to pay `10,000 to get the lease to lift sand from the Ghat.

Accordingly, a trap was laid and the Sub-collector was nabbed from his official residence at Uditnagar while receiving the cash from Baral.

The Sub-collector would be forwarded to the Vigilance court in Sambalpur on Thursday. A case under Section 7 of the Prevention of Corruption Act has been registered. In the event of his bail plea getting rejected, the Sub-collector is likely to be sent to judicial custody for 10 days and could also face suspension.

Government for better upkeep of highways

free counters

Indian Express reports

BHUBANESWAR: With the National Highways Authority of India (NHAI) neglecting its roads within the State, the Government on Tuesday urged the Centre for up-gradation, maintenance and modernisation of the

highways.

The issue was raised at a meeting attended by Union Secretary for Road Transport and Highways AK Upadhyaya here.

The State Government urged the Union Secretary for maintenance of roads entrusted to NHAI, construction of additional roadways along NH-60, renovation of the bridge over the Jira river on NH-6 near Bargarh and construction of by-pass roads in congested location.

Chief Secretary Bijay Kumar Patnaik requested Upadhyaya for expeditious completion of the highway projects taken up by NHAI and declaration of new projects for the State.

He further suggested that maintenance of more highways be handed over to the public works department (PWD) and more funds allocated to the State under the Central Road Fund (CRF) for 2011-12.

National Highways pass through 27 districts of the State touching 23 district headquarters with a total length of 3,704 km. Out of this 2,633.40 km are with State PWD and 1,070.60 km with NHAI.

The Ministry has sanctioned eight consultancy projects worth ` 15.26 crore for preparation of detailed project report (DPR) for up-gradation of 530.79 km of NH. Another seven projects for double-laning of 221.97 km at an estimated cost of ` 581.69 crore have also been sanctioned.

The review showed that the Centre had released of ` 507.98 crore under CRF against 151 roads and 21 bridges. Out of this, 132 roads and 21 bridges have been completed with utilisation of ` 478.20 crore and work on 19 road projects is in progress.

The State has also sought ` 50 crore for repair and restoration of the

highways damaged in the recent floods.

Development Commissioner RN Senapati requested for rationalisation of distance between toll plazas, collection of user fees and shifting of toll gates within 10 km distance of municipal area on NH-5 and NH-5A.

The need for development of public amenities like rest sheds, toilets, restaurants at regular interval of 50 km and setting up of modern trauma care centres at strategic locations on the highway were also highlighted in the meeting.

The NH Officers were advised to make district-wise segregation of land acquisition requirement so that each segment can be separately taken up with the respective district administrations.

Saturday, 29 October 2011

Steel city no longer enjoys heyday in State’s higher education

free counters

Daily Pioneer reports

Rourkela is generally known as the industrial centre of Odisha. But towards the close of the last century and also in the beginning of the current century, the steel city had earned the reputation of being a premier education centre not only in the State but also outside.

In those days, students particularly from western Odisha and nearby areas of Jharkhand and Chhattisgarh used to flock Rourkela in good numbers not only to pursue higher education but also to be enrolled in coaching institutes for various entrances exams.

There was a time when Rourkela was house to as many as seven management institutes offering MBA and PGDM programmes in addition to one pharmacy institute offering BPharma and MPharma, three engineering colleges, including the prestigious NIT, one training college, one law college, one homoeopathic college and several diploma engineering institutes.

The scenario in Rourkela pertaining to higher education has however been changing for the worse of late. Out of the seven management institutes functioning at one time, only two are functioning at present although introduction of MBA/PGDM in NIT has been an addition since last year.

Most of the institutes came up in the private sector mostly in the eighties and nineties in the last century. It is interesting to observe in this context that the decline started mostly due to management problems. Asian Workers Development Institute initiated by late Socialist leader and Parliamentarian Surendra Nath Dwivedi which had occupied a very high position among the then management institutes by offering courses such as Post Graduate Diploma in Labour Law and Personnel Management and Industrial Relations and Personnel Management could not attract students after Dwivedi’s death and the courses were closed. Although the institute is running at present by introducing other courses, it has already lost its pre-eminent position as a management institute.

Similar fate happened to Rourkela Institute of Management Studies (RIMS) and Indian Institute of Production Management this year. RIMS catapulted itself to the position of a top management institute not only in the State but also in Eastern India. But it could not recover from the loss due to the sudden demise of its founder Surya Patanaik. The present position of the institute can be assessed from the fact that this year nearly 40 students have taken admission in the MBA as against sanctioned capacity of 180. When the institute was in its prime position, all the seats would be filled up in matter of days.

The same fate has befallen the Indian Institute of Production Management which galloped into the top position among management institutes of the State from the inception itself during the early years of current century. The rise of IIPM was so phenomenal that during initial years its students used to occupy more than half of the top positions in rankings in the MBA stream. However, the IIPM which rode on the strength of academic excellence and all round abilities of Professor GC Mohapatra, who headed the department of MBA, quickly lost its steam with his exit in 2010.

The downfall of the IIPM was so sharp that whereas previously all its 60 seats would be filled up on the starting day of the admission process, even fifty per cent seats have not been filled this year. Institute of Chartered Financial Analyst of India (ICFAI) which runs a number of management institutes all over the country was also running a regular national college offering PGDM course and another under the distance education scheme a few years back with good number of students. It has also closed down as of now. Purusottam Institute of Engineering and Technology (PIET), a twelve years’ old educational institution offering BTech courses and Rourkela Institute of Technology (RIT) offering diploma engineering course had introduced MBA as an additional course in the year 2008 and all the seats were filled up in the same year.

The subsequent downturn has been so severe that they have stopped admitting students in to the MBA course from this year. The same fate has fallen to the Dr Ambedkar Memorial Institute of Technology and Science which was running MBA and MCA course in addition to BBA and BCA course a couple years back. The only addition has been the introduction of MBA course in the prestigious National Institute of Technology since last year but there also more than fifty per cent of seats have fallen vacant this year.

The Rourkela Law College is also heading towards a disaster due to lack of students. Kanak Manjari Institute of Pharmaceutical Studies which once enjoyed position as a top pharmacy institute throughout eastern India has also been on the downhill since last several years.

While many of these institutes have lost their name and fame due to management problems, many others have suffered decline for neglecting academic standards leading to decline in academic performance. Another reason is that students have become choosy and are not interested in wasting their time and money in institutes lacking in infrastructure facility and lack of suitable, qualified and experienced teaching staff.

One noted academician of the city Narayan Prasad Dash says besides poor academic standards and management problems in various institutions, the lack of air connectivity is a reason for decline of higher education in the city. Without air connection to the city, neither the renowned academicians nor the leading corporate houses are evincing any interest to come here for teaching and campus recruitment.

That is why the students and parents are keeping away themselves from city based institutions. Even the NIT is also suffering. So there should be a political will to have air connectivity to the city soon, says Priyanka Das, a student who is pursuing her management studies in Bhubaneswar.

Besides, the proliferation in the number of educational institutions has led to consolidation in the respective sphere in which lesser players are being squeezed out in favour of stronger players. All this has created a situation in which students and guardians have become losers in the long run. As a consequence, students are being almost forced in the absence of any alternative to get admitted to institutes outside Rourkela with the consequent financial burden on the guardians. Many deserving students are also opting out of higher education as their parents are not in a position to afford the cost outside Rourkela.

All these prove that the heyday enjoyed by Rourkela as an educational hub especially in the field of higher education is over at least for now.

Friday, 28 October 2011

Government to organise youth camps

free counters

Indian Express reports

BHUBANESWAR: The State Government on Thursday decided to organise youth camps in some select venues to give a boost to sports and youth welfare activities.

A high-level meeting chaired by Chief Secretary BK Patnaik on Thursday decided to organise 45 youth camps in venues selected in Bhubaneswar, Cuttack, Berhampur and Rourkela by the Sports and Youth Services Department. About 10,000 youths from all the blocks are expected to join the camps. Each block will be given an opportunity to sponsor 64 participants in different sports and cultural activities. The Chief Secretary directed the Sports and Youth Services Department to draw up detailed plan, schedule and modalities of the camps by end-November so that the youth camps could be organised in December. He emphasised on selection of youths with positive thinking and commitment for nation building. Bharat Scouts and Guides, National Cadet Corps (NCC) and national youth kendras (NYKs) will be involved in these camps. It has also been decided that youth clubs will be actively involved in promotion of sports and youth welfare activities. For this purpose, about 10,371 clubs operating at panchayat level will be given a grant-in-aid of ` 5,000 each. The Chief Secretary also advised the department to scale up adventure sports activities in association with Coast Guard and NCC units. The department has been asked to prepare a detailed plan for augmentation of sports equipment and infrastructure facilities in sports hostels.

Patnaik also advised the department to plan a special academic curriculum for inmates of sports hostels and provide better quality coaching, gyms and other amenities in the institutions. Development Commissioner R N Senapati, Principal Secretary, Finance, Jugal Kishore Patnaik, Director, Sports & Youth Services, Saswat Mishra participated in the discussions.

Wednesday, 26 October 2011

Govt approves Road Projects in AP and Odisha

free counters

A report from Zee News

New Delhi: The government on Tuesday approved two projects of widening of National Highways in Andhra Pradesh and Orissa entailing a total investment of about Rs 1,835 crore under its flagship road building programme NHDP.

The Cabinet Committee of Infrastructure (CCI) on tuesday approved projects for four laning of Vijayawada-Machlipatnam section of NH 9 in Andhra Pradesh and four/two laning of Birmitrapur-Barkote section on NH 23 in Orissa under National Highways Development Project (NHDP) phase IV-A, an official release said.

"The total estimated cost of the project (Andhra Pradesh) is Rs 736 crore. The total estimated cost of the project (Orissa) is Rs 1,098.90 crore," the release said.

Govt approves Rs 1,835 cr road projs in AP
On land acquisition, resettlement, rehabilitation and pre-construction, Rs 130 crore and Rs 320.75 crore will be spent on Andhra Pradesh and Orissa projects, respectively.

Both the projects will be built on design, build, finance, operate and transfer (DBFOT) basis in BOT (Toll) mode of delivery.

"The total length of the project is 64.611 km. The concession period is 20 years, including construction period of 24 months," the statement said about the Andhra Pradesh project, located in Krishna district.

"The project will reduce the time and cost of travel for traffic, particularly heavy traffic, plying between Vijayawada and Machilipatnam. It will also increase the employment potential for the local labourers for the project activities," it added.

Govt approves Rs 1,835 cr road projs in AP
On the Orissa project, which is based in Sundargah and Deogarh districts, it said the concession period is 23 years including construction period of 30 months for 125.61 km scheme.

"The project will reduce the time and cost of travel for traffic, particularly heavy traffic, plying between Birmitrapur-Barkote. It will also increase the employment potential for the local labourers for the project activities," it said.

Wednesday, 19 October 2011

Former FIH official appointed technical manager of WSH: Hopes for Rourkela rejuvenated

free counters

A report from TOI

MUMBAI: Former chairman of FIH Umpiring Committee, Dutchman Peter von Reth has been appointed as sports technical manager of the World Series Hockey league, which gets underway on December 17.

A highly respected official, Peter has been an international umpire for almost 20 years and officiated in 192 international matches, including three Olympics Games (Barcelona 1992, Atlanta 1996 and Sydney 2000) and two World Cups (Lahore 1990, Utrecht 1998).

He has also been an International Hockey Federation Umpire Manager and was in charge at the Athens 2004 and Beijing 2008 Olympic Games as well as the 2002 World Cup in Kuala Lumpur.

Peter has served as the chairman of the FIH Umpiring Committee from January 2002 to February 2009 besides doing duty as an integral member of the FIH Rules Committee.

In his new role, Peter will be responsible to appoint the technical panel required for the League, advice and assist in the conduct of all match officials in accordance with the rules and regulations of WSH along with the technical director of WSH; advice, assist and plan the video umpire requirements at each venue in addition to several other functions.

"It gives me immense pleasure to be associated with this league where a galaxy of stars will be exhibiting their skills and vying for the ultimate honour," said Peter.

"The league has much to offer to both players and fans and I am certain it's going to be a humongous success," he added.

The WSH, scheduled to conclude on January 22 next year, will feature 61 matches in which 176 players -- Indian and international -- will be seen in action.

The inaugural edition of the multi-city franchise based league will comprise eight teams -- Mumbai, Delhi, Chennai, Hyderabad, Bangalore, Chandigarh, Pune, Bhopal, Punjab, Ranchi and Rourkela.

Wednesday, 21 September 2011

RAILWAY DEMANDS FOR ROURKELA CITY

Here is a compilation of all the important and logical demands related to Railways which will be beneficiary for the citizens of Rourkela City

ADMINISTRATION

 Creation of a new Rourkela Division comprising of the districts of Sundargarh, Jharsuguda and Kendujhargarh, administered by East Coast Railways


NEW TRAINS

 Rourkela- Amritsar Brahmani Mail (Biweekly) via Jharsuguda, Bilaspur, Katni, Gwalior, Agra, H.Nizamuddin OR Rourkela-New Delhi Brahmani Yamuna Superfast Express (Biweekly) via Ranchi,Muri,Gomoh,Kanpur

 Rourkela-Bangalore City (Weekly) Superfast Express via Jharsuguda, Bilaspur,Raipur, Gondia, Nagbhir, Ballharshah, Kazipet, Kacheguda(Hyderabad), Kurnool Town, Anantapur, Dharamavaram

 Rourkela-Brahmapur Express via Sambalpur,Bhubaneswar(4 days) via Chakradharpur,Kendujhargarh, Jakhapura, Bhubaneswar(3 days)

 Biramitrapur-Paradweep Intercity Express via Rourkela,Rajkharsuan, Kendujhargarh,Jakhapura

 Visakhapatnam- New Delhi Express (Biweekly) via Koraput, Rayagada,Titlagarh, Sambalpur,Rourkela,Ranchi, Muri,Kanpur

 MEMU Local Train service between Rourkela/Tatanagar and Jharsuguda


EXTENSIONS

 12877/12878 New Delhi-Ranchi Garib Rath Express to Rourkela

 18623/18624 Rajendranagar-Hatia Express to Rourkela

 18103/18104 Tatanagar-Amritsar Jallianwala Bagh Express to Sambalpur and rerouting it via Jharsuguda, Rourkela,Ranchi,Muri, Bokaro Steel City on alternate days

DIVERSIONS

 12875/12876 Puri-New Delhi Neelachal Express via Angul, Sambalpur City, Rourkela, Tatanagar,Muri (3 days a week)

 18477/18478 Puri-Haridwar Kalinga Utkal Express on Kendujhargarh,Bansapani,Padapahar,Chakradharpur,Rourkela route

 12819/12820 Bhubaneswar-New Delhi Odisha Sampark Kranti Express via Angul,Sambalpur,Rourkela,Ranchi,Muri (3 days a week)
 12443/12444 Bhubaneswar-New Delhi Rajdhani Express , 2 days a week on Angul,Sambalpur,Jharsuguda,Rourkela,Tatanagar route

 15929/15930 Guwahati-Chennai Express via Tatanagar, Rourkela, Sambalpur, Rayagada,Visakhapatnam

 12409/12410 Raigarh-New Delhi Gondwana Express via Rourkela, Ranchi/Tata, Kanpur (3 days a week)

 18047/18048 Howrah-Vasco-da-Gama Amaravati Express; 2 days a week via Tatanagar, Rourkela, Jharsuguda, Bilaspur,Raipur,Nagpur,Nasik Road, Panvel, Roha, Chiplun,Ratnagiri

 16323/16324 Shalimar-Thiruvannanthapuram Express OR 12659/12660 Shalimar-Nagarcoil Express on Tatanagar-Rourkela-Sambalpur-Rayagada-Visakhapatnam route once a week.




INCREASE IN FREQUENCY

 12835/12836 Hatia-Yesvantpur Express to 4 days a week

 12889/12890 Tata-Yesvantpur Express to 3 days a week

 18311/18312 Sambalpur-Varanasi Express to 6 days a week



NEW ROUTES

 Allocation of Rs 200 crores to Talcher-Bimalagarh project for its fast completion

 Work initiation on Bansapani-Bimalagarh route

 Survey for Kiriburu-Gua and Kiriburu Bolanikhadan railway routes

 Survey for Biramitrapur-Lohardaga-Garwa Road

 Survey for Jharsuguda-Ambikapur via Sundargarh Town,Talsara



INFRASTRUCTURE DEVELOPMENT

 Construction of a Passenger Coach Terminal(Coaching Complex) and A.C. Charging Station at Rourkela Junction

 Removal of encroachment and construction of Platform-6, Multi-functional Complex and Northern Entrance Gate in the circulating area of the station

 World Class Station status to Rourkela Junction with renaming it as Rourkela City

 Construction of a Railway Coach Factory at Bondamunda

 Establishment of a Railway Medical College or Super Speciality Hospital at Bondamunda. The existing Railway Hospital at Bondamunda can be upgraded to meet the above purpose.

 Immediate allocation of model station and A-Class station facilities to Rourkela Junction

 Extension of Parking facilities at Rourkela Junction

 Construction of Foot Overbridge connecting Rourkela Station with Railway Colony and Madhusudan Marg on either sides

 Fast Completion of Basanti Nagar Railway Overbridge

 Construction of similar Railway overbridges at Kukuda Gate, STI , ITI , Kalunga and Kansbahal

Sunday, 28 August 2011

Rourkela-Kolkata air service from Sept 1

Times of India reports
http://articles.timesofindia.indiatimes.com/2011-08-27/bhubaneswar/29935165_1_rourkela-steel-plant-air-service-kolkata

ROURKELA: The Steel City of Rourkela is likely to get its first air connection shortly with a Kolkata-based private air service operator all set to start Rourkela - Kolkata air service from September 1 this year.

The necessary clearances from the Airport Authority of India Ltd and Rourkela Steel Plant have been obtained for launching the flight service, sources said.

DTDS, a Kolkata-based travel and tour operator, has got the clearance from Rourkela Steel Plant for using its airport to operate one private air taxi, which would be a three to nine seater flight. DTDS has been providing similar kind of air services from Bokaro to Kolkata. "Our technical team has already inspected the Rourkela airport and given clearance for operation of our flight and therefore we are absolutely ready to start the service," said Ronee Ghosh, area manager of DTDS India.